case study

Chase Farm Hospital

Supplied and installed in 2015 this was the first package Heat Pump unit 1st Systems have helped to design and install, The mechanical services were designed by QED Consultants http://qedconsultants.co.uk based in Hawkhurst, Kent. The builders were ARJ Construction and Mechanical services were installed by Odyssey 

Enviropack is an integral packaged unit that removes the need for external chillers, DX condensers or Boilers

The Task

Our objectives were:

To provide an efficient cooling and heating system

Our solution

The system was an Airedale/Barkell Enviropack package system; The units feature a variation of Airedale’s Enviropack cooling-heat-pump solution. Enviropack is an integral packaged unit that removes the need for external chillers, DX condensers or Boliers. The duty for this project was … but is available throughout the range, providing the option for cooling (10kW – 235kW) and heating (9kW – 218kW). Available in single and dual circuits, Enviropack™ delivers up to 4 stages of cooling or heating across multiple skid platforms. A single control panel manages both the refrigeration package and the AHU.

 

The system uses Thermal wheels or Plate Heat Exchangers to achieve at least 65% or 85% (respectively) efficiency in both summer and winter operation.

The units also incorporate electronic expansion valves to improve EER by up to 30% compared with standard thermostatic expansion valves.

Beckett House

Our objectives were to replace the rooftop plant with 2 Air Cooled Chillers and 2 Air Handling Units

Chase Farm Hospital

This was the first package Heat Pump unit 1st Systems helped to design and install

Eastbourne General Hospital

Air Handling Unit and matching Air Cooled Heat Pump Chiller

F.D. Copeland

Our objective was to provide heating, ventilation and filtration to the Essential Oil Mixing Facility

Ham Yard Hotel

To provide heating, air conditioning, fresh air and filtration to the many rooms in the hotel.