case study
Eastbourne General Hospital


The Task
1st Systems were asked for support in selecting a packaged HTM-03 complient Air Handling Unit and matching Air Cooled Heat Pump Chiller that could be supplied and installed together as a closed loop system.

Beckett House
Our objectives were to replace the rooftop plant with 2 Air Cooled Chillers and 2 Air Handling Units
Chase Farm Hospital
This was the first package Heat Pump unit 1st Systems helped to design and install
F.D. Copeland
Our objective was to provide heating, ventilation and filtration to the Essential Oil Mixing Facility
Ham Yard Hotel
To provide heating, air conditioning, fresh air and filtration to the many rooms in the hotel.